title: "Switchable Glass Office Installation London | Case Study | Glass Technique Ltd"
canonical_url: "https://gt.glass/case-studies/city-office-tower"
last_updated: "2026-10-04T04:17:37.821Z"
meta:
  author: "Glass Technique Ltd"
  description: "850m² of Technolite PDLC switchable glass installed across 12 floors of executive offices in London. Case study by Glass Technique Ltd."
  keywords: "glass supplier London, switchable glass, smart glass, security glass, fire-rated glass, acoustic glass, PDLC glass, mesh laminated glass, LED glass, Glass Technique Ltd"
  "og:description": "850m² of Technolite PDLC switchable glass installed across 12 floors of executive offices in London. Case study by Glass Technique Ltd."
  "og:title": "City Office Tower — Switchable Glass Installation"
  "twitter:description": "850m² of Technolite PDLC switchable glass installed across 12 floors of executive offices in London. Case study by Glass Technique Ltd."
  "twitter:title": "City Office Tower — Switchable Glass Installation"
---

Search products

[Back to Projects](https://gt.glass/projects)

Case Study

# City Office Tower — Switchable Glass Installation

Commercial / CorporateLondon, UKDuration: 8 monthsArea: 850m²

Glass Technique Ltd delivered a full-floor switchable glass fitout for a 12-storey commercial tower in central London, replacing traditional blinds with 850m² of PDLC smart glass. The installation gave tenants instant privacy control across executive offices and boardrooms while preserving the building's open-plan aesthetic and natural light.

![Modern office with switchable glass partitions and city views](<https://gt.glass/images/case-studies/city-office-tower/office with glass walls and city views, ideal for modern workspace settings.jpg>)

![Corporate meeting room with PDLC switchable glass partition](<https://gt.glass/images/case-studies/city-office-tower/corporate meeting room with glass partition.jpg>)

![High-rise office interior with floor-to-ceiling glass](<https://gt.glass/images/case-studies/city-office-tower/high-rise office interior.jpg>)

## The Challenge

A 12-floor commercial office tower in central London required a modern privacy solution for executive offices and boardrooms. The client needed flexible partitioning that could switch between transparent and opaque states — maintaining the open-plan aesthetic while providing instant privacy for confidential meetings. Traditional blinds were rejected due to maintenance costs and visual impact on the building's premium interior design. The specification also had to satisfy the landlord's fit-out guide, which imposed strict weight limits on partition glass and required all electrical components to be concealed within slimline frames. Lead times were tight — the client needed each floor operational within a four-week turnover window to avoid lease penalties.

## Our Solution

Glass Technique Ltd specified and installed 850m² of Technolite PDLC switchable glass across all 12 floors. Each partition panel was connected to a centralised control system integrated with the building's management platform, allowing individual room control via wall switches, remote controls, and the building's existing Crestron system. The installation included custom-sized panels up to 2300mm width, with edge-sealed laminated construction for acoustic performance. Panels were fabricated off-site to precision tolerances and delivered floor-by-floor, enabling the installation team to complete each level within the agreed four-week cycle without disrupting occupied floors above or below.

## Products Used

[Technolite Switchable Glass](https://gt.glass/product/switchable-glass)

## Technical Details

Glass TypeTechnolite PDLC switchable laminated glass

Total Area850m² across 12 floors

Panel SizeUp to 2300mm × 3000mm

Control SystemCrestron integration with wall switches and remote control

Switching Speed< 0.1 seconds

Power48V AC, < 5W/m²

## Results

The installation transformed the building's workspace flexibility. Tenants reported improved meeting privacy, reduced glare, and a premium aesthetic that attracted new occupants. The centralised control system reduced facility management overhead compared to the previously specified blind system. Post-installation surveys showed a 92% satisfaction rating from tenants, and the building achieved a refreshed fit-out that supported premium rental rates. All 12 floors were handed over on schedule, with zero safety incidents during the phased installation.

Start Your Project